The series

Every episode. Every layer we uncover.

The complete episode archive for the Memo Reno renovation—from early demolition through the systems, structure, and finish work still ahead.

7 publishedNewest first
EP. 07FINAL WALKTHROUGHMEMO RENO

Episode 07 · September 13, 2026 · 16:34

House Is Gutted. Final Thoughts. Before/After Walkthrough.

After several long days of demolition, the first work trip comes to an end with the abandoned house about as gutted as it can get for now. Cleanup is finished, the entire house gets a before-and-after walkthrough, and the open walls make it possible to take stock of damaged wiring, almost nonexistent plumbing, questionable framing, water damage, and old floors that may—or may not—be worth saving. The next questions are how to level the house, what is hiding beneath the floors, and which parts of the original house can be reused.

Watch this episode on YouTube
  • The first demolition trip comes to an end
  • Cleanup finished before heading home
  • A whole-house before-and-after walkthrough
  • Damaged wiring and almost nonexistent plumbing documented
  • Questionable framing, water damage, and old floors assessed
  • Leveling the house and checking beneath the floors become the next questions
EP. 06VERY SCIENTIFICMEMO RENO

Episode 06 · September 6, 2026 · 15:18

We Measured the House With Buckets. It Isn't Level.

With the walls stripped, Chelsea tackles the upstairs cleanup while Joel tries to fit one more load into the dumpster. Rain confirms a leak, a laser and some highly scientific bucket measurements reveal an uneven house, and a look underneath shows how little room there is to work. Before rebuilding, the house needs to be lifted and leveled.

Watch this episode on YouTube
  • Chelsea tackles the upstairs cleanup
  • Joel tries to fit another load into the dumpster
  • Rain confirms a leak
  • A laser and bucket measurements reveal uneven floors
  • A look underneath reveals limited working room
  • Lifting and leveling becomes the next major step
EP. 05EMPTY SHELLMEMO RENO

Episode 05 · August 30, 2026 · 20:36

From Abandoned House to Empty Shell—Finally Down to the Studs

The renovation reaches the point where the house starts to feel less like a home and more like an empty shell. The remaining interior comes apart, more framing is exposed, and the slow, dusty reality of whole-house demolition finally opens the structure for the decisions ahead.

Watch this episode on YouTube
  • Remaining interior material removed
  • Framing exposed across the house
  • Whole-house demolition reaches the empty-shell stage
  • Hidden conditions become easier to inspect
  • Slow, messy cleanup continues alongside demolition
  • The structure opens up for the next repair decisions
EP. 04DOWN TO THE STUDSMEMO RENO

Episode 04 · August 23, 2026 · 46:39

We Gutted the Entire Downstairs—Mostly*. It Got Worse.

The downstairs is taken nearly to the studs, revealing mismatched insulation, mysterious black patches, patched plumbing, chewed wiring, questionable framing, and more evidence of what had been hiding behind the walls. Along the way, the old mini-splits come down and an unplanned Break Room makes the worksite survivable.

Watch this episode on YouTube
  • Downstairs opened nearly completely to the studs
  • Mismatched insulation and black patches exposed
  • Old mini-split units removed
  • Patched plumbing and chewed wiring uncovered
  • Questionable framing and other hidden conditions documented
  • A conditioned Break Room created for the worksite
EP. 03THE SHEETS KEPT COMINGMEMO RENO

Episode 03 · August 16, 2026 · 17:05

The Drywall Sheets Just Kept Coming

The upstairs drywall was easy to remove because it had been hung but never finished—but there was far more of it than expected. Every cleared wall revealed more screws and another sheet, turning straightforward demolition into a full day of repetitive work in the heat.

Watch this episode on YouTube
  • Upstairs drywall hung but never finished
  • Exposed screws kept removal straightforward
  • More sheets appeared behind every cleared section
  • Repetitive teardown filled the workday
  • The planned first-floor work had to wait
  • Upstairs cleared for the next phase
EP. 02NOTHING MAKES SENSEMEMO RENO

Episode 02 · August 12, 2026 · 28:48

We Tore Into Our Abandoned House—and Found More Questions

With a dumpster on site and enough power restored for lights and fans, demolition began in a heat index around 106°F. Removing drywall and trash exposed chewed wiring, inconsistent framing, unusual insulation choices, and daylight coming through from outside.

Watch this episode on YouTube
  • Dumpster delivered for demolition
  • Lights and fans brought back online
  • Chewed wiring and inconsistent framing exposed
  • Almost no insulation beneath the metal roof
  • Upstairs drywall mostly removed
  • Demolition moving downstairs
EP. 01FULL BEFORE TOURMEMO RENO

Episode 01 · August 9, 2026 · 40:44

We Bought an Abandoned House Sight Unseen | Full Before Tour

The complete before tour of an abandoned South Mississippi house purchased sight unseen: roughly 1,800 square feet on three wooded acres, six hours from home in Texas, with unfinished construction and years of clutter inside.

Watch this episode on YouTube
  • House purchased sight unseen
  • Approximately 1,800 square feet
  • Three wooded acres
  • Unfinished construction and years of clutter
  • Questionable electrical and plumbing
  • An abandoned rooster came with the property

Archive in progress

New episodes will be added here as the renovation advances.

Every published entry links directly to its video. Follow the channel to catch each new release as the renovation moves forward.

Open the YouTube channel